Gotthard Summit Tunnel
Gotthard Summit Tunnel is a rail tunnel in Switzerland.
- Type: Rail
- Country: Switzerland
- Length: 15.0 km
- Opened: 1882
Overview
The original Gotthard railway tunnel between Goschenen and Airolo, opened in 1882 after nine brutal years. Around 200 workers died, many from disease and blasting accidents. It established the first truly competitive north to south alpine rail route and ran the firm of Favre into legend.
Related Tunnels
Gotthard Base Tunnel
The longest railway tunnel in the world, twin bores driven 2,300 m beneath the Gotthard massif. Built over 17 years as the centerp...
Lotschberg Base Tunnel
The first of the Swiss NRLA base tunnels, running deep under the old Lotschberg line between Frutigen and Raron. One full double t...
Vereina Tunnel
RhB single track meter gauge tunnel from Klosters Selfranga to Sagliains, carrying scheduled car shuttles that spare drivers the s...
Furka Base Tunnel
Base tunnel between Oberwald and Realp that replaced the 1925 summit line over the Furka Pass, which closed each winter under snow...